Video library

Get the Flash Player to see this player.
To use the view full screen function, please ensure you are using the latest version of Flash Player.
Pulsed Column Lab

Pulsed Column Lab
Taking apart the Pulsed Column Lab.
(32.5MB - Duration: 04:08)
Play video

The D1207 building crane

The D1207 building crane
Removal of the D1207 building crane.
(5.3MB - Duration: 02:50)
Play video

Breaking up the Thorium Plant

Breaking up the Thorium Plant
Breaking up the Thorium Plant.
(5.5MB - Duration: 03:33)
Play video

Technology Exhibition

Technology Exhibition
The 2010 Technology and Innovation Exhibition at Dounreay.
(15.9MB - Duration: 06:40)
Play video

The Dounreay Sphere

The Dounreay Sphere
The Dounreay Sphere - Design and Construction.
(42MB - Duration: 25:11)
Play video

History of the shaft

History of the shaft
History of the Dounreay shaft.
(12MB - Duration: 03:17)
Play video

Hydraulic isolation of the Dounreay shaft

Hydraulic isolation of the Dounreay shaft
Hydraulic isolation of the Dounreay shaft.
(25MB - Duration: 07:36)
Play video

Installation of a new 55 tonne crane into the breeder removal building

Installation of a new 55 tonne crane into the breeder removal building
A BFR decommissioning team led by Mark Aitken has successfully installed a new 55 tonne crane into the breeder removal building adjacent to BFR. The work was ingeniously carried out without removing the roof off the building so protecting the internal fixtures and fittings from the unpredictable weather outside.
(1.45MB - Duration: 00:29)
Play video

Going Underground at Dounreay

Going Underground at Dounreay
Going Underground at Dounreay
(16.8MB - Duration: 03:57)
Play video

Welcome to Dounreay

Welcome to Dounreay
Dounreay Induction Film
(27.4MB - Duration: 08:47)
Play video

PFR Reactor Inspections

PFR Reactor Inspections
PFR Reactor Inspections
(33MB - Duration: 05:32)
Play video

The building of the Dounreay Fast Reactor

The building of the Dounreay Fast Reactor
Historical movie
(19.7MB - Duration: 05:32)
Play video

Decommissioning Dounreay

Decommissioning Dounreay
Removal of a PFR dump tank
(7.5MB - Duration: 03:15)
Play video

D8550

D8550
The demolition of the plutonium criticality laboratory
(8.16MB - Duration: 05:04)
Play video

Countdown to Closure

Countdown to Closure
(30.2MB - Duration: 07:41)
Play video

The Building of the Prototype Fast Reactor

The Building of the Prototype Fast Reactor
The Building of the Prototype Fast Reactor
(48.4MB - Duration: 23:44)
Play video

Future Vision

Future Vision
Animated sequence showing the changing shape of the site between 2008 and 2032 (or earlier)
(5.67MB - Duration: 1:19)
Play video

D3900 Project

D3900 Project
Summary Movie
(31.83MB - Duration: 20:03)
Play video

Retrieval Facility

Retrieval Facility
Animation showing how the breeder material will be removed from the reactor using remotely-operated cutting and retrieval tools
(3.89MB - Duration: 1:16)
Play video

D1202 Demolition

D1202 Demolition
Demolition of D1202 at Dounreay
(15.4MB - Duration: 3:51)
Play video

Recovery of particles from the seabed at Dounreay

Recovery of particles from the seabed at Dounreay
Detection, retrieval and monitoring of an offshore particle
(43.4MB - Duration: 11:39)
Play video

D8550 Stack Removal

D8550 Stack Removal
Stack removal from plutonium criticality laboratory
(1.77MB - Duration: 1:09)
Play video

Tunnel History

Tunnel History
(5.69MB - Duration: 3:40)
Play video

Bookmark and Share