Video library
Technology Exhibition
The 2010 Technology and Innovation Exhibition at Dounreay.
(15.9MB - Duration: 06:40)
Play video
Hydraulic isolation of the Dounreay shaft
Hydraulic isolation of the Dounreay shaft.
(25MB - Duration: 07:36)
Play video
Installation of a new 55 tonne crane into the breeder removal building
A BFR decommissioning team led by Mark Aitken has successfully installed a new 55 tonne crane into the breeder removal building adjacent to BFR. The work was ingeniously carried out without removing the roof off the building so protecting the internal fixtures and fittings from the unpredictable weather outside.
(1.45MB - Duration: 00:29)
Play video
The Building of the Prototype Fast Reactor
The Building of the Prototype Fast Reactor
(48.4MB - Duration: 23:44)
Play video
Future Vision
Animated sequence showing the changing shape of the site between 2008 and 2032 (or earlier)
(5.67MB - Duration: 1:19)
Play video
Retrieval Facility
Animation showing how the breeder material will be removed from the reactor using remotely-operated cutting and retrieval tools
(3.89MB - Duration: 1:16)
Play video
Recovery of particles from the seabed at Dounreay
Detection, retrieval and monitoring of an offshore particle
(43.4MB - Duration: 11:39)
Play video
D8550 Stack Removal
Stack removal from plutonium criticality laboratory
(1.77MB - Duration: 1:09)
Play video