Skip to navigation Skip to content

A highly-skilled and professional workforce, making every £ work harder to reduce the hazard faster

Demolition of plutonium laboratory begins with stack

November 04, 2008

 Demolition has begun at the plutonium research laboratory with the removal of the building’s ventilation stack.

Workers inside the building cut through the base of the galvanised steel stack while a crane outside held it steady.

It was then lifted out and placed on a lorry, which transported it to a contained area where it will be cut into two pieces and consigned as low level waste.
 

Bookmark and Share