New LLW Disposal - Environmental Statement Addendum Volume 2 Figures
Figure 1.1 Site Plan Revised
Figure 3.1 General Layout Revised
Figure 3.2 Areas Considered for Site Selection Revised
Figure 3.3 Site Selection – Constraints Revised
Figure 4.1 Aerial Overview of Propose Scheme Revised
Figure 4.2 An Oblique Aerial Photomontage of Proposed Scheme Revised
Figure 4.3 LLW Vault Cross Section Revised
Figure 4.4 Grouting Plant Elevations and Floor Plans Unchanged
Figure 4.5 Administration Building Elevations and Floor Plan Unchanged
Figure 4.6 Pump Control Building Elevations and Floor Plan New
Figure 5.1 Water Treatment Area Plan Unchanged
Figure 9.1 Site Investigation - Borehole & Trench Locations Revised
Figure 10.1 Water Features Baseline and Surface Water Hydrology Revised
Figure 10.2 Average Groundwater Level Contours AOD Revised
Figure 10.3 Average Depth to Groundwater Map Revised
Figure 10.4 Projected Groundwater Levels during Construction and Operation Revised
Figure 10.5 Water Discharge Proposals Revised
Figure 12.1 Location of Designated Ecological Sites Revised
Figure 12.2 Existing Conditions 2002: Breeding Birds Unchanged
Figure 12.3 Existing Conditions 2002: Vegetation Habitat Survey Unchanged
Figure 12.4 2005 Phase 1 Habitat Map Revised
Figure 12.5 Location of Primula Scotica and Euphrasia New
Figure 13.1 Landscape Character Areas Revised
Figure 13.2 Cross Sections AA and BB Revised
Figure 13.3 Cross Sections CC and DD Revised
Figure 13.4 Photographic View Points for Photomontages Revised
Figure 13.5 Existing View and Photomontage of Proposed Scheme from A836 at Balmore Unchanged
Figure 13.6 Existing View and Photomontage of Proposed Scheme from A836 at Gunnscroft Unchanged
Figure 13.7 Existing View and Photomontage of Proposed Scheme from A836 at Achreamie Unchanged
Figure 13.8 Existing View and Photomontage of Proposed Scheme from Cnoc Freiceadain Chambered Cairns Unchanged
Figure 13.9 Existing View and Photomontage of Proposed Scheme from Sandside Harbour Unchanged
Figure 13.10 Existing View and Photomontage of Proposed Scheme from Achreamie Unchanged
Figure 13.11 Visual Envelope Mapping for Phase 1 Unchanged
Figure 13.12 Visual Envelope Mapping for Phase 2 Unchanged
Figure 13.13 Visual Envelope Mapping for Phase 3 Unchanged
Figure 13.14 Visual Envelope Mapping for Admin Building and Grouting Plant Unchanged
Figure 13.15 Visual Impacts on Buildings and Outdoor Sites Unchanged
Figure 13.16 Photographic Viewpoints for Photographs from Key Visual Receptors Revised
Figure 13.17 Photographs from Key Visual Receptors (Sheet 1 of 4) Unchanged
Figure 13.18 Photographs from Key Visual Receptors (Sheet 2 of 4) Unchanged
Figure 13.19 Photographs from Key Visual Receptors (Sheet 3 of 4) Unchanged
Figure 13.20 Photographs from Key Visual Receptors (Sheet 4 of 4) Unchanged
Figure 14.1 Cultural Heritage Sites Revised
Figure 15.1 Air Quality Receptor and Monitoring Locations Revised
Figure 16.1 Noise Receptor and Monitoring Locations Revised
Figure 16.2 Noise Contours at 2m above Local Ground Height due to Excavations Unchanged
Figure 16.3 Noise Levels due to Excavations – Detail Unchanged
Figure 18.1 UKAEA Land Ownership and Tenancy Map Revised
Latest Tweet:
Please wait while my tweets load from Twitter. If you can't wait or nothing appears, check us out on Twitter
Follow us: